Balthazar Bridge: read the project record, not just a headline.
Context
Ministry of Infrastructure · project-page photo; capture date not stated
Claim / question under review
What is documented for the planned replacement of Balthazar Bridge?
What the evidence says
The Ministry of Infrastructure lists a design-and-supervision project starting in 2024 and labels it ongoing. It names Beston Consulting Ltd and links the planned flood-resilient replacement to World Bank financing through the Grenada Resilience Improvement Project.
The page describes the existing bridge’s flood vulnerability and the intended replacement. Its listing is evidence of a documented project, not proof that construction is finished. A live ministry page may also lag current progress; check for a dated construction or completion notice.
The cover photograph is from the Ministry’s project page and is not presented as a completed replacement bridge.